3 storey office building with basement car parking. Precast concrete floors with a 400m² atrium though levels 1 and 2. The suspended concrete floors are supported on a steel moment frame with concrete filled circular hollow columns.
2600m² workshop and 400m² office. Steel portal frame construction with concrete tilt walls and timber framed offices. Images courtesy of Ambienti Team Architects